Manufacturing output is running at its strongest pace in nearly five years. Ask the people buying the materials how they feel about it, and the mood is sour. That contradiction sits at the center of the latest ISM® Manufacturing PMI® Report, and it shows where the strain in today’s supply chain lands.
Customers are holding too little stock. Suppliers are delivering late. Material prices keep rising. Something has to absorb the gap between what arrives, what it costs and what customers expect to ship. For most manufacturers, that something is the warehouse.
Manufacturers have long built their warehouses around known suppliers, predictable inbound and a bill of materials that dictates what moves where. Current conditions are testing that design, and the stress comes less from volume than from how often the plan changes. The warehouse used to be the stable part of a manufacturer’s supply chain. Now every upstream and downstream surprise arrives there as a change, and the plants that cope are the ones whose warehouse can change without a project.
Here is a week that is no longer unusual. On Monday, your primary supplier misses its delivery window. By Tuesday, you’ve approved a replacement vendor whose parts ship on different pallets with different labels. On Wednesday, two other late shipments land the same morning, and three customers whose own stock is low call to expedite orders. Nothing in that week is far-fetched. What matters is how much of it the warehouse can absorb without a custom development request, a call to IT, or the same few people who always handle exceptions.
This post walks through that week one change at a time, then gives you a way to test your own operation against it.
In this article:
- What is the latest ISM report telling manufacturers?
- What happens when late shipments and new suppliers hit the dock together?
- When a part is short, which order gets it?
- How do rising material costs change inventory control?
- How does labor affect how fast the warehouse can change?
- Could your warehouse handle that week?
What is the latest ISM report telling manufacturers?
Demand and output are strong, but the inputs that feed them are strained. Manufacturing expanded for the 10th consecutive month in October, with the PMI at 55.5. Production reached 59.0, its highest reading since November 2021.
The supply side tells a different story. Supplier deliveries slowed for an 11th straight month. Electronic and electrical components, memory, steel, copper and aluminum products all appeared on the short-supply list. Panelist sentiment worsened for a third consecutive month, with two negative comments for every positive one, and pricing volatility and longer lead times were the most frequently cited concerns. The strength is also uneven: demand is concentrated in areas like AI, data centers, semiconductors and defense, while other manufacturers describe cautious customers.
Customers’ inventories have now been “too low” for 25 months running, which ISM usually reads as a sign of orders to come. It also raises a question the report doesn’t answer: if customers aren’t holding the buffer and suppliers can’t guarantee it, who is? The Raw Materials Inventories Index rose 2.8 points to 51.4 and returned to modest growth in October, which suggests more of that buffer is landing on their shelves.
That puts pressure on the warehouse and it shows up as a run of small changes: a missed delivery, a new vendor’s pallets, a rush order. The sections below look at them one at a time.
What happens when late shipments and new suppliers hit the dock together?
The dock is where the week starts. Late shipments rarely arrive on schedule. They bunch up, dock doors congest, staging space fills, and the team has to decide what to unload, inspect and put away first, often without knowing which materials production needs most.
The delays behind these surges are not minor. The average commitment lead time for production materials stretched to 87 days in October, three days longer than in September. One machinery respondent said some lead times have stretched from four weeks to 50 weeks, that the company is hand-to-mouth, and that its own customers are complaining about its delivery delays. When parts finally arrive after a delay like that, they are usually needed immediately.
In our week, one of those trucks comes from the replacement vendor. A new supplier can bring different packaging, pallet configurations, labeling and delivery patterns, even when the material is identical. A new part number may need new item master records, units of measure, barcode formats, inspection rules, storage requirements and tracking attributes. Some of that belongs in the ERP, some in the WMS, and some requires both to agree.
This is where a manufacturer’s traditional advantage starts to slip. “Manufacturers are really controlled worlds. They can control their environment,” says Dan Waters, VP of Sales at Made4net. That control depends on stable suppliers. When a vendor you’ve relied on for years stops shipping, you still need the part, so you buy it somewhere else, and suddenly you have a supplier your setup doesn’t know.
The pressure to rush receiving is when shortcuts do the most damage. Receiving is where the warehouse captures the lot, supplier, purchase order and inspection data that every downstream decision depends on. Skip it to clear the dock, and the gap follows that material into production. The warehouse has to receive smarter, not just faster: identify production-critical material at the dock, capture its data without slowing the flow, and route it directly toward the line instead of into conventional storage.
In a rigid environment, every new item or supplier becomes an IT ticket or a custom development request. In a configurable one, operations teams absorb most of it through settings and workflows. For a manufacturer adding suppliers because of costs or shortages, that gap decides how quickly a new sourcing decision becomes usable inventory.
Run the test: Could your warehouse set up the replacement supplier’s items and move the production-critical pallets to the front of the line without an IT ticket, and without waiting on the one person who knows how?
When a part is short, which order gets it?
When a critical part is short, the warehouse stops simply filling orders and starts deciding which work order runs and which waits. The ISM short-supply list reads like a bill of materials: electronic and electrical components, memory, steel, copper and aluminum products. Demand adds to the squeeze. Order backlogs eased to 54.6 but are still growing, with 11 sectors reporting higher backlogs in October.
In our week, three customers call to expedite, and all three want the same constrained part. When customers carry little stock, a late order is no longer an inconvenience. It can stop their line.
In most operations, the ERP establishes commercial priority: promised dates, customer commitments and service-level agreements. The warehouse management system decides how eligible orders are allocated, released, picked and shipped. The failure point is the handoff. When the warehouse can’t act on changing priorities automatically, people fill the gap. Waters describes a pattern that shows up across the industry: “We’ll have somebody write it down. We’ll have somebody with a clipboard, somebody with a spreadsheet. Decisions will be made on the floor.”
Without system rules, a supervisor decides which order gets the part, and has to decide again every time priorities shift. A WMS with configurable allocation and task-priority rules lets the warehouse respond to changing deadlines without a person rewriting the plan by hand.
Run the test: Could your warehouse reprioritize an expedited order and re-point a scarce part to a different order without a supervisor rebuilding the plan on paper?
How do rising material costs change inventory control?
As materials get more expensive, every inventory error costs more, and inventory accuracy stops being a warehouse metric and becomes a cost-control and production-continuity issue. Raw material prices have now risen for 25 straight months, and ISM’s chair ties the pressure to inflation and tight material availability, made worse by the Iran war and trade wars.
As prices rise, a missing pallet of components is a real loss. A phantom one is worse. When the system shows inventory the warehouse can’t find, the line waits on material that technically exists. The practical response is to stop treating every SKU the same: count high-value, production-critical and error-prone items more frequently, and capture every movement.
Lot control raises the stakes further. In our week, the replacement vendor’s lot lands next to the last of the old vendor’s lot, and now two lots of the same item may share a pick location. The ERP or MRP links raw materials to finished goods, but the warehouse has to preserve the lot detail all the way to the line. When production calls for three of one component, four of another and six of a third, Waters says, “all of the lot hierarchy of everything that came in has to be tracked.”
He describes three options for that shared pick location: let the system track both lots and recall both if needed, physically separate the lots at the cost of more space, or require operators to scan each lot at pick, which slows labor. Each one trades space, speed or precision against the others. Disciplined lot control is what turns a problem into a precise response: “I can go to the computer and say, that lot was received on this day, here’s where it went, and here’s what’s still in my warehouse that I’ll now quarantine and freeze so it can’t be allocated against orders.”
Run the test: Could your warehouse tell you, in minutes, where every unit of the old vendor’s lot went, and quarantine what’s left, without anyone walking the floor?
How does labor affect how fast the warehouse can change?
Labor determines whether a process change actually reaches the floor. A system can be reconfigured overnight, but if only a few experienced people understand the exceptions, the operation adapts only as fast as they can.
Hiring is growing, but modestly. The Employment Index slipped to 52.4 in October while staying in expansion for a fourth month. Manufacturers adding capacity will need warehouse staff who become productive quickly and move between tasks as workloads shift.
Every control the warehouse adds also lands on that workforce. A lot scan at pick or a separate location for each lot improves accuracy, and each costs labor or space that has to come from somewhere. The way to keep that cost down is to build controls into the workflow so they don’t depend on memory. Directed tasks, mobile scanning and validation at the point of work tell an employee what to do next and catch mistakes as they happen. Manufacturers can measure the effect through time to independent productivity, transactions per labor hour and error rates.
Run the test: Could a new hire carry out this week’s changes from the screen, or would it all fall to the same few people who handle exceptions?
Could your warehouse handle that week?
Go back to the week we started within the introduction: a primary supplier slips, a replacement comes in, two late shipments land together, and three customers need orders expedited. Put these questions to your own operation:
- Could we set up the new supplier’s items without an IT project?
- Could we move production-critical receipts to the front of the line and point scarce parts at the right orders?
- Could we trace the old and new lots separately and quarantine what we need to?
- Could newer employees carry out all of it, or would it fall to the usual few?
An operation can post strong KPIs under normal conditions and still be fragile under change. The ISM data suggests normal conditions are not the forecast. Make sure operations, not just IT, designs how the warehouse will respond, and measure what any new control costs on the floor before you add it.
Building a warehouse that adapts
Manufacturers are producing more in a supply chain that leaves them less margin for error. Customers won’t hold the buffer. Suppliers can’t guarantee it. That leaves the warehouse, and the systems running it, to absorb the difference.
WarehouseExpert™ WMS gives manufacturers configurable allocation, direct receiving and replenishment, and lot-level inventory control built to change alongside the business. Run the week above against your own warehouse. If any answer is “we’d open an IT ticket,” that’s where to start the conversation.